For a nice break from building closet furnishings, I treated myself to a furniture project. Pictured above is my new office desk that I built in less than 4 hours including finishing with a 2-part hard wax oil. Now begins the more time-consuming task of organizing all of my office supplies and financial records.
Filter Cleaning
I noticed that the performance of my woodshop dust collection system has been gradually declining over recent weeks. I figured it was time for some filter maintenance. I was shocked by the amount of dust that had accumulated within the fabric folds of the filter media. I estimate the pile of dust could easily fill a pair of 2-liter soda bottles. Predictably, when I returned the cleaned filter to service the dust collection performance was back to peak levels. Going forward, I think more frequent filter maintenance will be warranted.
Noisy Receiver
I recently purchased a 5.1-channel AV receiver to complete our 2-person theater in the River House. Paired with some high-quality speakers that I used with my last surround sound system I am quite pleased with the fidelity and sound stage. Jeanine and I rented Oppenheimer which proved to be a perfect choice for testing the system and an incredible movie. Eventually, however, l noticed distinctly audible white noise during times when the soundtrack got very quiet. I grabbed my signal generator and oscilloscope to verify the issue. The oscillograph above shows a fairly significant noise component superimposed on what should be a pure sine wave. It should be noted that this is most perceptible only when the volume is turned up quite high. Even so, I must now decide if I will return the receiver because of this issue. It would be a no-brainer if the system did not sound so good otherwise. I have just under thirty days to decide.
Hooded Merganser
UPDATED: This post initially misidentified the above bird as a Bufflehead. Fortunately, followers of the blog include avid birders who care enough to help me get my facts straight.
Like the Wood Duck, the Hooded Merganser is closely associated with forested wetland habitats. In breeding season, this bird is especially common around the Great Lakes, although it is widespread in many other regions as well. Year-round populations occur in two ranges: The first, in the East, extends from Nova Scotia south and west to eastern Oklahoma and northern Louisiana. A second, smaller year-round range includes parts of coastal and southern British Columbia, Washington state, and patches in Oregon and western Montana. The Hooded Merganser is a short-distance migrant, moving south to avoid harsh weathers. The majority winter along the Mississippi Flyway in the south-central U.S.
I copied the description above from a birding site to ensure no further errors.
When I Had Hair
After my mother died, I discovered a folder she kept containing press clippings covering my time in high school, college, and my early business career. I found several items that I had never seen before. My scrapbook contained the photo above but not the article. Reading it brought back many memories. I had forgotten that I trained under US Olympic wrestling coach Jim Peckman alongside future Olympic super heavyweight champion Jeff Blatnik. I often wonder, how far I could have taken my wrestling career had I focused on athletics over academics. I am sure I made the right choice, but I still like to ponder what might have been. The digitizing project I started yesterday was in full swing today as I captured dozens of news and magazine clippings.
Memory Lane
Having moved our entire household three times in the last three years, I have decided to digitize all memorabilia that will be stored rather than displayed. This is for the benefit of our kids who will not have to sort through it all when we pass away. Instead, each will receive a thumb drive containing all of these items and all the photos I have taken over the years. Pictured above is my senior class photo from Union College. Of my classmates, Richard Templeton was famously successful. He eventually became the CEO of Texas Instruments and recently made a $51M donation to the college. He married classmate Mary Haanen pictured immediately to his right.
Trivia Night
Jeanine is staying with friends on Martha’s Vineyard this weekend. It has become an annual trek in celebration of Irene’s birthday (front left). The crew spent the evening at the Black Fog competing in Trivia Night. Despite considerable Harry Potter knowledge, they were not able to secure a top 3 finish but enjoyed a spectacular evening nonetheless.
Gypsy
Kyle is headed to Austin, Texas later this month where he will be cat-sitting for Gypsy, a gregarious 8 year old Tabby cat. This is part of his strategy for spending the winter months in warm places. He has enrolled in a service that matches him with people from around the globe in need of pet or house sitting. In exchange for the supervision provided, he enjoys free lodging and access to the household amenities (in this case a pool). His job allows him the flexibility to work from anywhere that has electricity and internet access.
Spice Drawer
Maya has offered to help Jeanine organize her spices in our new kitchen. She takes after her father when it comes to this obsession. The spice bottles that she ordered arrived today and the extent of my involvement in this project was to unpack them and place them in the designated drawer. Jeanine and Maya will do the filling, organizing, and labeling. They estimate that the collection will have 90 spices which means that the last 4 rows of bottles will be spares.
Third Time The Charm
The third bedroom closet in our new house is tiny by comparison to the others, but no less deserving of custom shelving. Today, I completed the pictured built-in that features a high rod, low rod, shoe and boot shelves for 10 pairs, and three general-purpose shelves. The sliding mirrored doors provide access to either side of the closet. Interestingly, the bedroom itself is larger than the other two, this by design to accommodate a dresser or desk.
The Color of Love
With a major Nor’easter forecasted for Valentine’s Day, I thought it wise to pick up roses for my sweetheart a little early. She has been the love of my life for 40 years.
Sound Bar
In preparation for a visit from the kids to watch the Super Bowl together, I fitted the TV in our living area with an over-the-air antenna and sound bar so we could tune in to the game and listen to the broadcast in high fidelity. When it is just Jeanine and I, we watch television in the small 2-person theater off the kitchen. We included a second large-screen TV in our house plan just for occasions such as today when we are entertaining a larger group. When not being used for this infrequent purpose, the TV will be used to display my photographs in a picture frame mode and the soundbar to stream music.
Finger Saver
Jeanine’s father, a salesman for Simonds Saw (files, bandsaw blades) used to refer to woodworking machines as “meat and bone saws” given their ability to quickly separate an operator from one of their digits. These tools are especially dangerous when cutting smaller pieces. I have been using wood biscuits extensively in the construction of the shelving for our walk-in closets. Since the shelves are horizontally aligned, the biscuits mechanically interfere with each other in the middle of the vertical supports into which they are seated. Solving this problem is a simple matter of trimming a tiny bit off the side of each biscuit. That is easier said than done safely. I built this simple jig to facilitate the operation and to keep all my fingers intact.
Family Knitter
My mother, who was an excellent knitter, would have been so proud of Maya upon the completion of her first sweater. In the works for a couple of months, Maya shared this photo of the completed project with the family and immediately received an order for one from Kyle. She is quoting a lead time of one year 🙂 which dissuaded the rest of us from placing our orders.
Just Add Hangers
The walk-in closet of our main bedroom is 11 feet deep. I completed the shelving/hanging unit that hangs on the right wall today. It features 3 feet of a high-hanging rod, 8 feet of low-hanging rod, and 16 shelves of various heights principally designed for shoes and boots. There is room on top for larger items such as luggage. The left side of the closet will have a built-in 16-drawer dresser with shelving above. I expect to begin that project next week. Tomorrow, I hope to complete a similar unit for the smaller guest room walk-in closet.
Ducks in a Row
When I built the kitchen and bathroom cabinetry for the River House, it was still under construction and I had little trouble making large components in the shop and then moving them into place fully assembled. Now that the walls have been painted, the floors finished and the stair railing installed, it is much safer to construct new built-ins in situ rather than risk dents and bruises to the new house. Pictured above are some of the parts for our future walk-in closet. My plan is to do all machining in the shop and tranport the pieces to the bedroom where I will do final assembly. The holes will support the hanging rods and the long slots are for biscuit joints that will be used to support shelving. It is important they all be aligned perfectly so that adjacent shelves appear as one continuous line. This will make more sense when I share a photo of the finished unit (perhaps as early as tomorrow with any luck).
Side Table Side Project
For the last few weeks, we have been using a 14″ cube made of styrofoam as a side table for the swivel chairs in our living room. It was part of the packaging material for our new couch and just the right size. This morning, I woke up with a design in mind for a permanent replacement made from leftover bamboo plywood. I thought that a cube was just a little too basic so I decided to add an 8-degree taper giving it a wider top than bottom. In aggregate, I spent under three hours capturing CAD for the design, building it, and finishing it with a hard wax oil. The main project for the day, however, was applying finish to all the plywood that will be used to construct shelving for the walk in closets of the main and guest bedroom; a total of 256 square feet. Jeanine and I worked together to complete the job which took a solid three hours.
CoO
At long last, we have received our Certificate of Use and Occupancy for the River House. Construction of our new home started on August 4, 2022, which makes the build duration 550 days or 18 months. The time for permitting, design, and demolition of the old house adds another 9 months or so. The journey has not been without obstacles and some measure of strife. On the other hand, it represents the fulfillment of a lifelong dream and we could not be happier with the result. While there is still more work to be done, we have now crossed a new threshold, that of the home where we plan to spend the rest of our lives.
Final Document
Pictured above is the last document needed to secure a Certificate of Occupancy for the River House. It was produced by our surveyor who captured the final field data today. The drawing shows the setbacks of the house from the property lines. You may notice that we are under the 15 feet limit on our northern side yard. Fortunately, there is a provision in the town code that allows you to be up to 3 feet under the side yard setback if you add that amount to the opposite side yard setback. The original house was situated in this asymmetrical fashion to optimize the river views in both directions. The rear yard setback is interesting in so much as our lot includes the land out to the middle of the Sudbury River. Barring any glitches, we should have our CoO tomorrow.
Sudbury River Sunset
As we were returning from rug shopping, Jeanine and I were treated to a spectacular sunset over the Sudbury River. Our timing could not have been more perfect and I am thankful for this gift of light.
On The Move
Yesterday, we obtained a temporary certificate of occupancy for the River House!!! All that remains to be done before obtaining our final CoO is to submit an updated as-built plot plan that includes the roof overhangs. Our surveyor will be here on Sunday to take the necessary measurements and we should have the needed drawing by Monday.
In the meantime, we are free to start moving in which we have decided to do gradually, one carload at a time. My nephew, Rory, helped out with Jeanine’s stationary bike which will initially be located in her sanctuary. The gradual move allows us to organize the new house one room at a time. In about a week, we will be ready to rent a small van to move the larger items over.
The Build Show, Episode 2
The second episode of The Build Show covering our home just dropped. Host Matt Risinger and our architect Steve Baczek cover several aspects of the interior space including my shop, the mechanical rooms, the kitchen, the front door, the master bathroom, and the stairs.
Initial Closet Design Concept
Now that all the requirements for occupancy have been addressed, I am moving on to the design and construction of the built-ins for our walk-in closets. Jeanine completed an inventory of all her clothes, shoes, and accessories so that I can ensure they will each have a proper-sized space. I have not done the same exercise but should be fine if I allocate myself half of what she needs. Pictured above is an initial concept which is sure to undergo refinement. It features 16 drawers, spaces for 54 pairs of shoes, 11 feet of lineal hanging rod, 20 large shelves, and a countertop.
Inspection Day
At long last, we had our final inspections for the River House today. We passed our energy storage system (battery backup) electrical, fire, and building inspections. Only the permitting for the Natural Resource Commission has been more arduous than the battery. Because the technology is so new, the fire inspectors have approached the whole situation with an overabundance of caution. The next Concord family that decides to install an ESS will have us to thank for blazing the trail.
We were not so fortunate with our occupancy inspection. We failed on two counts. (1) We have been using the area under the landing for our basement stairs as a storage area for leftover paint and tile. Access to the space was by way of a 45″x 30″ opening. By code, the interior of this space needs to be finished with 5/8″ gypsum wallboard to impede fire propagation. The amount of work to do this in such a confined and irregular space would not be worth the benefit. Our other option was to permanently seal off the access opening which is what I opted to do. Pictured above is the final result which I completed after a run to Home Depot for the materials. (2) The door to the garage needs to be self closing. The one we have is equipped with self closing hinges but they had not been engaged. I attempted to do so, but a manufacturing defect in one of the hinges prevented me from finishing. I have called our builder to address this problem as it should have been installed with the springs engaged in the first place.
It would have been nice to pass on our first attempt, but I am thrilled that our punch list is so short. As soon as the garage door is addressed we should be good to go.
Rory
My nephew Rory has been visiting for the past week and will be with us for the next. He is an talented personal trainer among other things. Nico invited him to Boston for an intense week of physical training and healthy eating. His amputee soccer teammate, Jovan is also staying at the Road House and participating in the training/eating regime. Regrettably, I have been so occupied with preparations for the final inspection at the River House that I have spent very little time with him thus far, a situation I plan to rectify in the coming week.
Bella
Maya is dog-sitting for Bella again and joined us at the River House this afternoon before embarking on the continuing repairs of her tiny house. Bella is the best-trained dog I have ever known. She can do a handstand or jump up onto Maya’s back on command. She is also adorable and very cuddly once she gets to know you.
Shop Sink
For the last 8 months or so, I have been operating without a shop sink, something that is quite essential when working with glues and finishes. During the first 4 months, I had to go upstairs and outside to the detached garage where our temporary water service was located. Talk about inconvenience. Once the water service was connected to the house, I only needed to walk upstairs to the laundry room, a monumental improvement but still not ideal. Today, I decided it was time to install the sink I had planned for my shop. Because our septic tank is located above the level of the basement a lift pump is needed to pump the drain water up to the main drain line. I had the plumbers leave stubbed lines for the drain, vent, and water supply lines near the shop ceiling in anticipation of this day. The first order of business was to build a cabinet carcass and mount it to the wall. While I was at it, I decided to repurpose a set of floor standing shelves into a wall mounted version. Next, I connected the lift pump (lower left) to the drain, vent, and discharge pipes and plumbed in the hot and cold water supply lines and shutoff valves. Finally, I added the countertop, backsplash, sink and faucet before connecting up all the hoses and wiring . The faucet can be turned on and off with a gesture – very convenient when your hands are covered in varnish and hence the need for wiring. Eventually, I will add drawers and doors to the front of the cabinet but for now I am very content to have an operational sink no more than a few steps away.
Morning Joe
Jeanine and I are spending nights at the River House to free up beds for our guests at the Road House. Visiting from Seattle is our nephew Rory who is here to help Nico and his amputee soccer teammate Jovan, our other guest, with 2 weeks of intense physical training. We woke up to about an inch of fresh snow and Jeanine can be seen here enjoying her morning coffee.
Inspection Ready
At long last, the stairs and railings are done. I put the final coat of finish on this afternoon and we are now ready for inspection. In total, the railings took about 3 weeks of build time, and the stairs about the same. If I had known just how much work would be required, I might have opted for a turnkey solution. On the other hand, the savings we realized could purchase a small new car. I am most appreciative of my gluing and finishing assistants, Jeanine and Nico.
Capped
After weeks of work all 150 balusters, 7 Newell posts, 4 hand rails, and 3 guard rails have been permanently installed. The final step was to glue top caps to the Newell posts. We are now officially ready for inspection by the building department and hope to have our occupancy permit shortly. Tomorrow, I will do some final sanding and finishing work and then move on to built-ins for our walk-in closets.
Newell Joints
To maximally stabilize the Newell posts I am constructing for the River House, I decided to channel them through the end of the stair tread before fastening them to the floor. This adds a considerable amount of strength at the expense of a rather complicated mating joint with multiple critical dimensional tolerances. Machining these was possibly the most stressful work I have done on the house thus far The slightest mistake on either part would have resulted in a depressingly large amount of rework. I perfected my approach on scrap material before attempting the work on the final components and thankfully this led to a successful outcome.