Maya shared this photo of a magnificent Cooper’s Hawk she took from the sink window of her Somerville apartment. Notice the way she used the branches to frame her subject. Regrettably, Maya is suffering from mononucleosis and reports that she is feeling worse than her very difficult bout with Covid. Jeanine is fighting the urge to rush over with chicken noodle soup out of respect for her autonomy and with the knowledge that her roommates are taking good care of her.

Plumbing Proceeds

With framing completed it is time for the mechanical systems to be installed. Drain lines depend on gravity to operate properly so plumbing is the first mechanical system to be installed allowing for maximum flexibility in pipe placement. Next comes heating and cooling because they have the largest ducts, and then ventilation followed by electrical. I can already tell I will be pleased with the work based on watching the skill with which the two-man team from M&R Plumbing operates. Pictured above is the laundry room washer dryer supply and drain.

Subtraction

Up until today, all work on the River House has been additive. We added a foundation, added framing, added sheathing, added windows, etc. Today, for the first time, the process of subtraction began with the arrival of the plumbing team. They began drilling holes throughout the house for drain and vent pipes. I decided to join them in my capacity as the ventilation system installer. The Zehnder ERV system we are using requires 32 runs of 3″ tubing to various rooms in the house. I completed drilling all the necessary holes today, a task that was as strenuous as it was satisfying. A lot of the work was done overhead which rained down sawdust that found its way into very unexpected places on my body. In several areas, I had to drill a 3-1/4″ hole through a 3-1/2″ wide 2×4. Much harder than it sounds, I was quite pleased with my results as pictured above. Each bore hole had to go through the 2×4 and the 1-1/8 inch flooring below for a total of 2-5/8″ which made for a lot of work, not to mention sawdust.

Pancake Breakfast

The kids and two bonus daughters (Fiona and Grace, two of Maya’s housemates) joined us for a pancake breakfast this morning. Jeanine was on the griddle for banana pancakes and I was in charge of the standard Calabria recipe with options for pecans and/or chocolate chips. Regular and turkey bacon completed the meal.

Blue Boxes

Now that I have placed the mounting brackets and boxes for ceiling lighting, I am moving on to outlet boxes. Placing them is a matter of compliance with the electrical code and, more importantly, thinking ahead to furniture placement and use cases. Before all is said and done, there will be more than one hundred such boxes distributed throughout the home. Once again, the bulk of my time is spent thinking rather than installing since there is no going back once the drywall is installed.

Behind The Silence

Burton Craige is the husband of my cousin Heather. He is in Boston this weekend with his brother and sister-in-law to donate some 300 wartime letters written by their father to Harvard University. Jeanine and I joined him for dinner in Cambridge this evening and learned of his father’s exploits which our eloquently summarized in the letter Burton wrote appended below.

BEHIND THE SILENCE

In recent weeks I have been working with my brother Tito and sister-in-law Kim in compiling my father’s wartime letters. Ernest Craige graduated from the University of North Carolina in 1939. A brilliant student, he won a Rhodes Scholarship, an award he was unable to accept because the program was put on hold when the war broke out on September 1, 1939. Instead of going to Oxford, he entered Harvard Medical School, joining a class whose education was compressed so that newly minted doctors could be deployed to the war zones in Europe and the Pacific. Ernie graduated from Harvard in 1943 and, after a brief internship, joined the Army that fall. Sent to Texas, he was assigned to the Fifth Auxiliary Surgical Group. 

After months of training and many false starts, the Fifth Auxiliary made its way to Normandy in late August 1944. The surgical teams followed the troops across France and Belgium and into Germany, treating injured American soldiers and Nazi victims, including allied POWs, slave laborers, and concentration camp survivors, as well as German POWs. In the spring of 1945 in western Germany, Ernie, age 26, was given the enormous responsibility of directing six rapidly improvised hospitals with thousands of beds in the chaotic conclusion of the European war. In June 1945 he and the Fifth Auxiliary were sent to Marseille, where they waited for their redeployment to the war in the Pacific. Only days before they were to be shipped to the Far East, the atomic bomb forced Japan’s surrender and the end of the war. 

For his entire life, Ernie was a remarkably gifted and prolific cartoonist. To the delight of his classmates and comrades, he captured their experiences with a keen eye, a deft hand, and a trenchant wit. Immediately after the war, he published a collection of cartoons documenting the wartime experiences of the Fifth Auxiliary. Brilliantly executed, “Our Hearts Were Young With Gay” is a timeless record of the miseries, absurdities, and joys of army life. 

While in Europe, Ernie (“Tito”) sent dozens of letters to his parents in El Paso, Texas, and his brother Branch, an Army doctor who was directing a malaria research project at a federal prison in Joliet, Illinois. As children, we treasured our father’s cartoons. But beyond the cartoons, we knew nothing of his wartime experiences. He never spoke about the war. 

In reading these letters, I am again amazed by our father’s extraordinary talents, wisdom, and humor. At the same time, I regret not having known, read, and talked about the letters with him while he was alive. In the last year of his life, while he was confined to a bed in the assisted living facility at Meadowmont in Chapel Hill, I read him the collection of letters his grandfather Ernst Kohlberg wrote to his family in Germany in 1875-77 as an émigré to El Paso. My father took great pleasure in hearing these letters. I wish he had asked me to read his own wartime letters, many written from Germany not far from the towns that his Jewish grandparents left to come to America.

Like my father, many veterans of World War II were reluctant to talk about the war. These letters have caused me to reflect about the reasons for that silence, for that generation in general and for my father in particular. 

Perhaps the first reason, shared by millions of veterans, is the horror of war. My father’s letters –muted because of military censorship and fear of alarming his family– describe experiences that no one would want to relive: 

[A German insane asylum converted into an American hospital] is intact and was somehow bypassed by the avalanche that came through this area. All the other towns are completely destroyed — just heaps of rubble, furniture tumbling out of shattered second stories, burned out tanks, tracks all along the road, and scores of swollen dead horses, carts, a mess of clothes, ammunition, etc.  (3/2/45)

The Stalag [for Russian POWs] here was perfectly incredible – patients had to eat each other; they were shot if they poked their heads out of the door, etc. The Russian doctor tells me that 60 dead daily in a camp of 18,000 was routine. (3/4/45)

With this new field hospital we moved to this little town … less than a day after the tanks moved through. …The roads have occasional roadblocks … [a]nd some well-placed machine guns. These obstacles apparently were not as formidable as planned and the roadblock is pushed off to the side and plenty of Krauts are lying around. A lot of them died in their foxholes and can be seen clutching a potato grenade or a burp gun.  (3/5/45)

This camp we’re in now is also inhabited by several hundred refugee slave laborers from all over Europe gathered up by our advance. They had hidden in caves and holes until the Germans went by and then delivered themselves to the Americans. They are of every nationality and are very motley looking.  (3/12/45)

The way the [allied] armies are knifing across Germany prevents any very effective defense. We had quite a busy run of it for a few days being the only field hospital this side of the river for three days in the army area….The casualties that we got were as usual very severe — traumatic amputations, chests, bellies. 80% required either thoracotomy or laparotomy.  (3/31/45)

All along the roads there were thousands of Belgians, French, Russians, Polish, liberated POWs and slave laborers. They were very down-at-the-heel looking. Occasionally you pass the grimy gray barbed wire enclosed barracks in which they have spent the last 3 – 5 years. Many such camps kept a large herd of police dogs to catch escapees. In order to free one group of prisoners our soldiers had to machine gun a large pack of these brutes. These foreigners have a few camps along the road but in general there is a considerable degree of disorganization and they wander in the general direction of France or Russia living off the land which must be a source of terror to the natives.  (4/13/45)

If one goes across Germany more and more examples of the incredible brassy cruelty of these people are uncovered. It’s like rolling over a stone and having all the foul crawling insects revealed scurrying about. The citizens however are unperturbed, impenitent – whereas yesterday they gladly benefited from the slave labor of these thousands of Russians, Poles, etc., today they would indignantly demand protection from ravages of the unfortunate creatures…. We have been getting several bullet wounds and squashed skulls daily from the sporadic episodes of violence which followed the wandering in search of food and roof by these foreigners. (4/18/45)

We are open now as a station hospital which apparently is what most evacuation hospitals will do in occupied areas. Some evacs are needed in the horrible pesthole concentration camps that are constantly being liberated.  (4/20/45)

You can believe anything you read about these incredibly ghastly German concentration camps. There are four kinds of camps as far as I can make out.

  1. For regular POWs: some bad and some not so bad
  2. Stalags for foreign workers: Black bread and soup, barracks etc.
  3. POWs and workers boarded out on farms, bakeries etc. OK
  4. Concentration camps political prisoners etc. ghastly  (4/23/45)

More frightful POW camps full of Americans have been uncovered. A hospital moved in to take over. A major back from there gave a most horrible description: four in a bed, three dead, the other too weak to push them out. Other dead: buried in such a shallow fashion that to scuff the earth would reveal the decaying remains of American boys. The average citizen here though is bland about the whole thing and considers himself as guiltless as somebody in Joplin.  (4/26/45)

Did you see the description of those death traps at Buchenwald etc. in TIME last week? The Stalag a couple of miles from here was not so spectacular but the same story.  (5/8/45)

My new assignment is a 300-bed hospital which runs along all right without me. It has mostly surgical wounds with many, many amputations and 100 infections as is true in all German hospitals I have seen. (5/19/45)

At present I’m near one of the big cities in the Ruhr…. The city is an absolute ruin in the downtown area…. The air raids did most of it I guess. The [German] doctors here say the problem of taking care of casualties was terrific. They had to let almost all guts & bellies go and take care of what they could of the extremities. The latter ones 100% foully infected with amputation as common as flies. (undated, probably June 1945)

I’m glad we won’t have to patch up any more American boys who have just had parts blown off. (8/14/45, after Japanese surrender)

So for my father and many others, the war was a violent interlude that one longed to forget, not an uplifting story to be told and retold. Their aversion to reliving the past was reinforced by their dreams for a radically different future. In these letters, my father began to envision a new life back home, where he could build a family and launch a career. He declined an offer to take the Rhodes scholarship after the war, telling Branch “I will have had enough of these foreign countries after this campaign and the next one.” (4/20/45) He applauded Branch’s engagement and marriage to Jean McCracken in 1945, and said he hoped to follow their example (6/26/45). He rejected an offer to work with Branch on the malaria research project in Illinois. (7/5/45) Instead, he decided to apply for a residency at Massachusetts General Hospital or Boston Children’s Hospital. (8/7/45) 

When Ernie returned to the United States, his final army assignment was to treat wounded veterans at a hospital in Denver. There he met and fell in love with Hazel Fischer, an army nurse from Minneapolis. Married in September 1946, they settled in Boston, where Ernie began a cardiology residency under the guidance of the great Paul Dudley White. With a busy schedule of patient care, teaching, and research, a new marriage, and four children arriving at two-year intervals, Ernie decisively turned the page, leaving the war far behind.

While most returning veterans made a similar transition after the war, Ernie’s personality ensured a deeper level of silence. Although he had multiple talents, recognized by all who knew him, he never spoke of his accomplishments. He was incapable of telling a story that placed himself above others. While confident of his talents, he was the epitome of self-deprecation. He knew that whatever he had done, suffered, or lost in the war, others had done, suffered, and lost more. Perhaps he felt that to speak of his war would have dishonored theirs. 

Finally, Ernie’s silence about the war may have reflected painful losses at home that coincided with his army service. His beloved mother Else died of breast cancer in El Paso in early 1944. On the final day of 1944, his father Branch died of a heart attack in El Paso, while Ernie was encamped with the Fifth Auxiliary in Belgium during the final German counteroffensive. Because of delays in mail deliveries, Ernie did not learn of his father’s death until the evening of January 25, 1945, when he received a letter from Branch II listing unresolved issues about their father’s estate. Ernie wrote his brother the next day: 

This letter of yours hit me about 9:00 o’clock last night. We were having a little party for one of the nurses whose birthday it was. I had to get out — to think this over — and put on my coat and walked about 5 miles. It was the most magnificent night I have seen. Bitter cold but with clear sky, full moon — the ground covered with thick snow. You could see a block or two away with ease it was so light. I hate to be stuck here in what seems to be the end of the world while you must have had your hands full at home. I wish I could have been of some help.

Of his father Ernie wrote, “I know of no one more kind, loving, devoted.”  

His father’s distant death was forever linked to the terrible sights that Ernie witnessed in the final months of the war. To protect himself and his family, he closed the door on the past, leaving these letters behind.

Burton Craige

February 6, 2023

64 Degrees

Less than two weeks ago on February 4th, we experienced a record-low temperature of 10 below zero. Today we had a record high for this day of 64 degrees as shown on my car’s temperature display. When I took this photo, I was returning from Home Depot where I purchased 4 combination smoke/CO detectors, 6 smoke-only detectors, and 2 heat detectors, all required to meet the fire code for new home construction. The six hundred dollar bill was small compared to many other purchases for the house, but it irks me that this expense will be incurred every ten years when the internal batteries reach the end of life and all the units will wind up in a landfill. I would love to see an investigative report on how this requirement made its way into the fire code.

Kyle’s Kitchen

With the flooring and drywall completed the next phase of Kyle’s basement renovation project is the installation of the kitchen. It is a compact space but he has room for all the essentials.

CA Wrestling Squad

The Concord Academy Wrestling Team finished third in the end-of-season Eastern Independent League tournament with one champion at 128 pounds. This will mark Nico’s fourth season as the assistant coach.

Slider Window

The last and largest window was installed on the River House today. It is 13 feet wide by 8 feet tall with a 4-foot sliding section. If I had to guess, I would say the triple pane unit weighs close to 800 pounds. Much of the morning was spent repairing a corner that was damaged in the last attempt at installation. I was skeptical that it would be done to my satisfaction but was pleasantly surprised by the quality of workmanship. The house is now fully enclosed. The front door assembly is the last opening to fill and will remain boarded until we finalize a decision and await delivery.

Obsessive Lighting Placement

I spent the entire weekend installing mounting brackets for recessed ceiling light fixtures throughout the River House. It only took about 4 hours for the actual installation. The remaining 12 hours were spent figuring out EXACTLY where I wanted them to go and setting up my laser to locate them precisely. Pictured here is the ceiling of the aviary (Jeanine’s she shed / office). The original lighting plan I developed called for 6 fixtures. I decided to up the total to eight once I was actually in the space. The aviary has the highest ceiling in the house (12 feet at the peak) and light intensity falls off with the square of distance. Therefore the amount of light that falls on a desktop in a 12-foot room is roughly half that you would get in a 9-foot room. In addition to ensuring the proper amount of light, I was obsessed with centering in hallways and with respect to windows and achieving symmetrical ceiling patterns. This is something no one else will ever notice but that will please me ever time I look up at the ceiling.

We Believe

Every so often I search YouTube to see if there are any new videos that promote the American Amputee Soccer Association. This recent post is more of an advertisement for Veo but does feature some nice game footage and comments by Nicolai.

Potential Set Back

Today, we were hoping that the last window would be installed in the River House. The specialized crew that is doing the work saved the largest for last. It spans a length of 13 feet, includes a sliding door, and takes 8 people to lift. When I arrived on site after a morning work meeting, I discovered that one corner had been damaged although I never learned just how. The lead installer assured me that this could be fully repaired and that they had done this before on other large windows. We shall see. They are set to return on Monday with the necessary tools and parts to do the work.

New Mural

I have been so busy with work and the new house that I just noticed this mural in West Concord for the first time. The 24′ x 8′ full-color grand mural designed by Edward Feather and painted by Edward and a team of West Concord artists is located on the side of 30 Beharrell Street facing the Post Office. It celebrates West Concord’s industrial history as a vibrant, multicultural, entrepreneurial factory and mill town. The mural is the third in a planned series of five murals that are or will be displayed throughout West Concord.

Minnesota Memorial

This past Sunday, my brother hosted a memorial service for our mother at his home in Minnesota. A more formal service will be held in Schenectady this spring. Angela spent the last few years of her life living in Minnetonka and it is little surprise that she made many friends during that short time. It was important to Mark and his family that they and her local community be given an opportunity to celebrate her life. On display throughout their home were many works of art created by her.

Floored

Kyle sent this image of his completed basement floor. The bathroom and kitchen cabinetry and tile work are remaining to be complete as well as the interior doors and trim. At some point, I hope to show some before and after photos. The transformation has been very dramatic.

Siding Design Concept

Working with Tess, we have settled on a design theme for the siding on the River House. We will use a slate-colored vertical board and baton for the principal siding component with horizontal tongue and groove accents in warm red-toned wood material. Not fully illustrated is the masonry foundation at the base of the entire structure which will also cover the entire walkout basement wall. This rendering is missing the east wing roof but conveys the basic color/design scheme. It has been fun experimenting with the various possibilities for blocking and color combinations.

Tess

Visiting us from Seattle for the next few days is Tess, one of Jeanine’s dearest friends. We have hired her to help us with the interior design of the River House. She flew in on the red-eye this morning and we spent a good portion of the day selecting materials and reviewing design elements. We feel very fortunate to have someone with her expertise and artistic flair assisting us with the myriad choices to be made at this stage of the project.

Record Cold

Last night temperatures dipped to 10 below zero with high winds driving wind chill down below minus 30. I stopped by the River House this morning to make sure we did not have any downed trees or other damage. Fortunately, there was none but I will have to wait until temps rise above 32 to determine if our temporary water service survived. The Sudbury River was frozen solid except in front of our house where a natural spring enters the river from below. Future grandchildren, should we ever have any, will have to be warned about thin ice in this part of the river. I spent the afternoon with Kyle using a very heavy concrete grinder that we rented. It was necessary to flatten the floor in his basement after the subcontractors he hired to do the flooring installation made a totally unacceptable attempt to level the concrete. It will not be perfect but we were able to address the most egregious problems.

Winter Popsicle

Work on the River House today was canceled because it was too cold. Plummeting temperatures did not stop Maya from her routine of walking to work, however. I am pleased to see that she seems to be dressed for the conditions. There is something about this photo that makes it very clear that it was insanely cold outside.

10 of 26

Ten of twenty-six windows were installed today. The crew doing this work does nothing but European-style window installation. Their experience and expertise were apparent at every turn. I spent half the day installing most of the ceiling boxes for the ventilation system covering both the first and second floors with only the basement remaining to be done. Each box will connect the tubes that carry air to and from the ERV (Energy Recovery Ventilator) with the supply and exhaust diffusers that spread air into or remove air from the rooms in which they are installed. During the remainder of the day, I worked on an idea for one of my consulting gigs which is beginning to show great promise. Regrettably, I am not at liberty to disclose any of the details.

Windows!

Our German-made Schuco windows arrived on site today. Fitted with triple pane glass, even the small ones are extremely heavy. The large ones take four very strong people to move. The largest will probably require at least a dozen workers to install. It took the entire day just to move the windows into the house and to begin positioning them in the rooms to which they belong.

RIP Bruce

On the way to the construction site this morning, I was shocked to see an old friend lying dead on the side of Sudbury Road. Bruce, an extremely large male beaver, was a frequent visitor at the River House. When our site supervisor first saw him lounging on the ice he mistook him for a small black bear, which was an easy mistake to make given his massive size. His tail slap was loud enough to make you jump out of your shoes if you were close by and I think he enjoyed the reaction. Even though he did fell a favorite dead tree that was a popular and very photographic bird perch, I was very fond of Bruce and will miss him. When I returned from the site on the way to my annual physical, Bruce was gone. Perhaps animal control had picked him up but I am left to wonder if someone saw the potential for a magnificent beaver fur and seized the opportunity.

The Geo Connection

With our two geothermal bore holes completed and a 300-foot U-shaped pipe grouted into each, the next step is to connect the vertical loops to each other and then to the house. The crew excavated around the bore holes to a depth of 4 feet and cut off the steel casings at that depth. A similarly deep trench was made between boreholes and to the foundation of the house where the supply and return lines enter through two holes drilled through the foundation wall. The pipes from each bore hole are connected in parallel and then to the house from the midpoint of the parallel connection (to promote balance flow to each loop). A strip of metal tape was placed over the pipes so they could be located in the future and the trenches were backfilled concluding all the outside work for our geothermal heating and cooling system.

Amp Soccer Clinic

Nico spent the weekend in Denver putting on an amputee soccer clinic. Essential to building the US program are outreach programs such as this which bring young players into the sport. While in Colorado, he connected with his high school buddies Greg and Cray.

Maya ventured to the North country where she enjoyed skiing with friends despite her injured shoulder. MRI scans have since confirmed that she has a SLAP tear and torn rotator cuff. Her doctor has suggested an ultrasound-guided steroid injection at the tear to help her manage the discomfort. Unfortunately, such injuries do not heel with time and she will likely require surgery at some point in the future.

On the home front, Kyle and I completed the wiring for his basement renovation. All the lighting and all but 3 outlets worked as expected. It took a while to figure out that the drywallers had covered an outlet box leaving the following section of that circuit disconnected. We excavated the wall, found the box, and completed the installation of an outlet at that location. Presto, all remaining outlets became energized. On a less positive note, we discovered that the flooring installers had done a very poor job of leveling the concrete leaving behind several dips and high spots. With half the flooring already placed, it will be quite a lot more work to now remove it and address the hills and valleys.

It Fits

We specified 10-foot wide garage doors on the new house so we could be more relaxed while parking than is the case with the 8-foot wide doors at the Road House. In addition to the fun of making the first ingress, I wanted to confirm that doors could be swung open to their full extent without hitting the walls. My car was very happy for the elbow room.

Home Stretch

Kyle’s basement renovation project is in the home stretch. Drywalling and floor leveling have been completed. Kyle used contractors for these jobs as neither one of us was too keen on doing it ourselves. Both require specialized tools and benefit from considerable experience. This weekend we will work on installing the recessed ceiling lights, outlets, and switches. We will also get his garage door working again after the drywaller managed to disconnect the electrical circuit which feeds it.

Patterned Ice

The patterns one can find in ice never cease to amaze me. Talk about the ultimate Rorschach test. If you have a few minutes, click on the image and look around. I think you will be amazed at how many interesting images and shapes you will discover. So far, this winter has been quite mild with daytime temperatures occasionally hitting the mid-forties and often remaining above freezing. Given the amount of mud surrounding the construction site, it is generally advantageous when working on the outside of the house for the ground to be frozen. Naturally, now that work is moving to the inside, when warmer temperatures would be appreciated, the forecast is showing us heading into a cold spell.

Temporary Stairs

One area of the River House that has been very difficult for me to visualize has been the stairs and railings. As of today, our construction foreman single-handedly completed temporary ones to facilitate interior work on the house. Seeing and using them has helped us to finalize design decisions for the final versions. I think they may be one of my most favorite design elements of the house. The photo perspective makes them appear cramped and steep. In reality, they are quite spacious and have a 7-inch rise over 11-inch run, which is widely regarded as the optimal ratio for climbing and descending.

Buddha

Occasionally, a photo and title tell the whole story. I found my brother like this on our couch this morning talking to Jeanine. I could not resist running for my camera. Marie, his better half, requested a headshot for work. Although I do not have a proper photo studio set up at the moment, I did manage to make an acceptable image, which was not much of a challenge with such a lovely subject.

This website is dedicated to sharing, with family and friends, the day-to-day adventures of the Calabria family.