Bridge 2.0

2015-08-15 112818 009

On a bike ride this morning I traveled under the railroad bridge on Main Street where work is underway to increase the height of the bridge over the roadway. The decapitation of more than one truck by this bridge has been well documented on this blog over the years and it is about time that something is being done to address the situation. It would have been far easier to lower the roadway, so I can only imagine that the water table was too high to permit doing so. Pictured in the foreground is the new bridge which has been staged on temporary supports. I imagine it will be lifted and placed by cranes when the old bridge is removed. What is not at all clear to me is how they will increase the height of the tracks to match the new bridge height without disrupting daily commuter train traffic. Rest assured I will be monitoring the situation carefully.