A view from the bottom reveals the structure of the cantelevered base and angled support members. We used composite decking over pressure treated pine. The floor stands some 14 feet above the ground. The entire structure is supported by four lag bolts. Key joints have been reinforced with steel tape and all the hardware is galvanized steel. I will add safety lashing around the tree to guard against a bolt failure. Ladder design is still under development.
