An early start and forecasted rain made for significant progress on Maya’s tiny house today. We were determined to get as far as installing the ridge beam so we could tarp the house in a fashion that would shed rather than pool water. Despite having to make two unplanned trips (1 hour each) to Home Depot for additional hardware and lumber we managed to reach our goal and then some. The roof will have a steep section (pictured) at the front and back with a dormer over the loft for increased headroom. In the last hour of the day, we were able to install all of the rafters for the steep section. Hard to believe this was a flat platform just two days ago.