Cabinet Prep

Maya is spending the summer completing work on her tiny house. What remains to be done are the built in cabinets and flooring. After about a week in the design phase she is now working on construction. Pictured here are a number of plywood panels to which she is gluing 1/2 inch solid stock edging. In the background she is doing the same to stretchers that will divide drawer sections. She is using a European style frameless cabinet to maximize space utilization and has opted for push to release closures to eliminate the need for handles. Eliminating handles buys back an inch and a half of extra maneuvering room for occupants of the kitchen.