Plaster work on the River House should be completed this week and will be followed by wood flooring installation but not before the indoor humidity reaches an acceptable level. I installed a digital hygrometer on each floor to monitor humidity levels. At this time it is hovering around 85% and the current and forecasted weather is not going to help much. I am going to look at renting an industrial dehumidifier to help speed things along.