Master Tile Work

Perhaps our most admired sub-contractor on the River House project is Marcio. He has been slowly and meticulously tiling each of the four bathrooms. Pictured above is the alcove above the tub in our third bathroom. His attention to detail and craftsmanship is next-level. He has had to suspend work temporarily while the flooring guys moved in to do their thing so he has been helping out the stone masons on the outside of the house. It looks like both the tile and stone work will be completed in about two weeks and the flooring should be done by the end of this week.