Except for the sink in my shop, all plumbing fixtures at the River House have been installed and are operational. Even though there is still much work needed to complete the project, this feels like a major milestone. At this point, we could start living in the house if we needed to. The glass partitions for the shower areas arrived today and I hope to install them over the weekend. I am afraid that my shop sink is a low priority and will have to wait until I have had a chance to build the cabinet for it. Until then, the laundry room has a utility sink I can use which is a huge improvement over bringing paint brushes back to the Road House to wash out.