Day 1 of our kitchen makeover. I removed all cabinet doors, drawer fronts, and associated hardware. I took a still photo after each door was removed and combined the sequence into a time-lapse video. I stopped after the first tier because it was taking too long. As it stands, all 44 doors and drawer fronts have been removed. By far the most tedious part of the job comes next; cleaning and sanding. I will try to do this in small batches over many days.