At long last, framing work has commenced at the River House. Prior to the crew’s arrival, I excavated 6 beam pockets in the ICF foundation walls realizing that this work would be far easier if completed before the mudsills were attached. It took me about 20 minutes to clear each pocket which will be used to support beams running underneath the first-floor joists. I finished just in time and to my great amusement discovered I was covered in tiny bits of insulation. The photo above was taken after I thought I had dusted most of it off my body. The framers, possessing goat like balance, spent all of their time walking on top of the very tall foundation walls. First they capped the entire top with a thick copper foil that will prevent termites from reaching the wood structure. Next, pressure-treated mudsills where cut to size, drilled to accommodate the concrete anchor bolts, and fastened to the wall tops over a bead of sealant. The video below is a time lapse of the operation.