With soccer season over, I was able to work with Kyle today as well as yesterday. I completed the electrical wiring and the supply side plumbing while Kyle made great progress on the insulation. We also ordered the tools we will need to level the bathroom floor and expect to tackle that job next weekend. When I returned home, I complete the insulation cover that will be used to protect the temporary water supply at the River House from freezing. Working by headlamp at the end, I installed a thermostatically controlled pipe heater and then the cover. This should be adequate for the immediate future but I will need to run some calculations to see if more insulation or a more powerful heat source will be needed when temperatures get really low.