Kyle and I leveled the floor in his future basement bathroom this afternoon. Kyle was in charge of mixing 200 pounds of leveling compound and I for spreading it. The rough area in the before photo is where we removed a portion of a 4-inch slab on which the old toilet was installed. The remainder of that slab will be hidden underneath the future vanity and was left in place to avoid damaging the old soil pipes.
Next weekend we will be ready to drywall the bathroom walls and install the shower base and vanity. Working with Kyle each week and watching him acquire new skills has been very rewarding.