Last night the drilling rig was repositioned for the second bore hole location. The casing for the first bore hole can be seen to the left of the mini-excavator’s left tread. Bedrock was encountered at 141 feet with minimal water. The next steps are to install the geothermal loop tubing into the holes and then fill the holes from the bottom up with grout to ensure proper thermal coupling of the pipes to the ground.