Kyle’s basement renovation project is in the home stretch. Drywalling and floor leveling have been completed. Kyle used contractors for these jobs as neither one of us was too keen on doing it ourselves. Both require specialized tools and benefit from considerable experience. This weekend we will work on installing the recessed ceiling lights, outlets, and switches. We will also get his garage door working again after the drywaller managed to disconnect the electrical circuit which feeds it.