Today, we were hoping that the last window would be installed in the River House. The specialized crew that is doing the work saved the largest for last. It spans a length of 13 feet, includes a sliding door, and takes 8 people to lift. When I arrived on site after a morning work meeting, I discovered that one corner had been damaged although I never learned just how. The lead installer assured me that this could be fully repaired and that they had done this before on other large windows. We shall see. They are set to return on Monday with the necessary tools and parts to do the work.