I have been ordering many of the long lead items that will be needed to complete the River House construction. Items are arriving almost daily at the Road House where I have learned to unpack and inspect each one even if the packaging looks fine. Today, one of the medicine cabinets that will go into the main bedroom arrived via FedEx. The outer box showed no signs of trauma. The interior packing was very robust and also intact. Despite this, when I removed the cabinet, I discovered one corner of the frame and mirror were damaged. I am glad I caught this now rather than in mid-summer when this cabinet would have been installed. Still, I am not looking forward to the replacement process which generally involves a lot of finger-pointing and paperwork.