Kyle spent the entire day helping me install the ventilation tubes that will supply fresh air to the River House. In total, the project requires some 1500 feet of tubing. Kyle’s preferred method for carrying the 150-foot spools struck me as very amusing. By the end of the day, we completed 14 of the 32 runs from various parts of the house to the mechanical room where they will be connected to a Zehnder Comfoair Q600. Pulling these corrugated tubes through the joists and cutouts between floors is some of the most physically tiring work you can imagine. Every muscle in my body is sore from the effort and I imagine Kyle will be moving a little slowly tomorrow as well.