Covered

The roofing crew finished paneling today. On Monday, they will return to fold the standing seams and finish some of the edge treatments. We choose a light color for energy efficiency reasons even though we thought a darker grey would have looked nicer. Because of the way the house is situated on the lot and relative to the river, it turns out that the roof is only visible for a few seconds as you turn into the driveway from the street. We could have picked pink polka dots and it would have made no difference to the appearance of the house (unless viewed from the air).

While the roofers were on top of the house, I spent the day in the basement redoing every pipe joint (some 40+) of my compressed air distribution system. Earlier this week, I discovered that the Teflon tape method I initially employed leaked at almost every joint. I have since learned that this application calls for pipe dope. Once I completed the very tedious rework, I ran a 240V line to the shop and fired up my new air compressor. No leaks and everything is working as expected. I left the lines pressurized and will check to see if there is any loss of pressure tomorrow.