The conduit for our buried utility services was laid today. The two larger ones are for electricity. Each one can support wires for a 200 amp service. We only require one but decided to install a spare should we ever need to increase power to the house or run some future service from the street. The incremental cost of the extra conduit is small compared to the rest of the project. One of the smaller conduits is for fiber optic and the other is for cable. Jeanine has been coordinating with Concord Municipal Light and Power, Comcast, and Verizon to have all the wires on our old utility pole transferred to the new one that was placed a few weeks ago. Talk about an exercise in herding cats.