I completed the tall kitchen cabinet carcass for the double oven today. So far it has been the most time-consuming to build. All but one of the front faces required veneering, the “shelf” which supports the ovens had to be designed to support a 350-pound load, and the cavity had to be dead plumb, level, and square. It is also the heaviest single item I have built so far which made it difficult to move and install. There will be a drawer below the ovens and a cabinet with two doors above it. Still needed is a filler strip on the left to close the gap to the wall which is one of the few in the entire house that is not perfectly plumb; argh. Even though it fought me almost every step of the way, I am extremely happy with the finished product.