Septic Tank Excavation

Excavation for a new septic tank and pump chamber took place today at the River House. The addition of our attached garage forced us to relocate the existing ones because they no longer met the setback requirements. The tanks are due to arrive on site tomorrow and we are hoping to have the septic system operational by the end of the week. That leaves water as the last service we need to connect to the house. We may choose to put this off for some time since it will involve tearing up the driveway and we still have many trades coming and going on a daily basis.