Work on the River House walkway commenced today. The rather long path will include a stone slab bridge over a dry stream that will carry water away from the house when it is raining. A large angled boulder top located in the corner where water falls from the roof will direct water away from the siding and into the stream bed. Unfortunately, plantings in this area of the yard will have to wait until the spring.