It has taken some time to get around to completing the stairs to the garage. I finished the structural portion several months ago to facilitate access to the house. The plan post-construction was to top the structure with the same white oak flooring used throughout the house. I intentionally left a roughly sanded surface to reduce the possibility of slipping when coming into the house with wet or muddy shoes. I was very satisfied being able to use all scrap/left-over materials for this project.