
I spent a couple of hours today “chipping away” at our wood chip piles. Of the 21 tons we started with, I estimate that only 9 remain, all to be spread adjacent to the street. Pictured above are some of the areas that have already been filled in. Given the August heat, I am only able to work for one or two hours a day. It provides a surprisingly effective workout for both strength and cardiovascular training. I keep telling myself that it is a good way to prepare for the fall soccer season, but that remains to be verified. The trick has been to do a little bit every day. Kyle has helped me on two occasions, which made the work go three times faster.
I also completed the design of a switch enclosure for my new deionized window washing system. It will get strapped to the carbon fiber extension pole, allowing me to select between regular water for washing and pure deionized water for the final rinse. The switch will be press fit into the enclosure.
