One Ton / Day

Armed with a new 10 cubic foot yard cart that I picked up this morning, I set out to attack the first of four wood chip piles that now grace our property. It took twelve 5-gallon buckets to fill the cart, which equals 8 cubic feet. So much for the Gorilla brand marketing claim of ten. The density of Red Pine wood chips is ~33 pounds per cubic foot, making the cart total ~264 pounds. After an hour of work, I managed to install 8 carts’ worth of wood chips and was ready to call it a day. This puts my installation rate at one ton per hour. At this pace, it will take me 20 more days to conquer all four piles. When temperatures begin to drop a bit, I suspect I will be able to work for more than an hour a day. If nothing else, I should be in pretty good shape by the time my fall soccer season starts.