Kyle and I leveled the floor in his future basement bathroom this afternoon. Kyle was in charge of mixing 200 pounds of leveling compound and I for spreading it. The rough area in the before photo is where we removed a portion of a 4-inch slab on which the old toilet was installed. The remainder of that slab will be hidden underneath the future vanity and was left in place to avoid damaging the old soil pipes.
Next weekend we will be ready to drywall the bathroom walls and install the shower base and vanity. Working with Kyle each week and watching him acquire new skills has been very rewarding.
All plumbing fixtures but one are located in the west wing of our new house under construction. The exception is the kitchen sink/dishwasher which is located as far from the sewer pipe as you can get. Such pipes must slope downward 1/4″ for every foot of run to keep water flowing in the right direction. To achieve this slope AND keep the pipe out of sight, it was necessary to create a 3″ channel in the ICF which I did the afternoon. Once the pipe is installed, I will re-insulate and protect it with a metal barrier to prevent an errant screw or nail from puncturing the pipe.
Jeanine said she should see She Said so I said she should. In fact, we both did, our first movie at a theater since the beginning of the pandemic and my first tongue twister since the inception of this blog.
Yesterday’s rain created the perfect opportunity to assess the levelness and flatness of our newly poured basement floor. Finding the lowest valleys and the highest peaks can be very time-consuming using a rotary laser. With a basement full of water, however, the task becomes trivial. Slosh around until you find the deepest water and take a depth measurement. Slosh around some more until you find the most shallow water and take a measurement. Subtract the two numbers and you have the maximum variation (+/- 3/8″ in our case). Continue sloshing about and you quickly get a feel for the variability in the depth of water as a function of location which provides an indicator of flatness. I used a pair of plastic trash bags and some duct tape to fashion make-shift galoshes for my less-than-waterproof boots. After recording my measurements, I pumped out the water to avoid forming an ice skating rink when the temperatures drop below freezing this evening.
The first snow of the season is usually cause for jubilation. This year, however, I am hoping for as little as possible so as not to delay construction on our new home. With all the concrete work done and rough grading completed, we could be looking at a framed shell by Christmas if the weather cooperates. Framing resumes in earnest on Friday when Tstuds shipped from Newton, Iowa are scheduled to arrive on site. Our geothermal wells could be drilled as early as next week.
Jeanine and I visited the River House early this morning to survey the newly poured concrete floors. In addition to the completed foundation, we were treated to steam fog rising from the river which was more lovely than a still photo can convey. We then drove to Chelsea where we looked at different options for an entry door to the house, one of the few remaining choices we have to make to complete the exterior envelope. Next, it was on to Burlington to the Kohler showroom where we selected all our plumbing fixtures for the bathrooms and kitchen. Finally, I made a second visit to the River House to check how level the new floors were. It was cold and getting dark so my measurements were rushed and will need to be repeated. My initial estimate is that the basement is level to within +/- 1/2″ across 1800 sqft. with a maximum diagonal of 81′ 6″. I am not thrilled with this result and may decide to add a leveling compound to the base.
After waiting a month to receive a part from China, I was able to upgrade the flash unit I most often use on my camera from a plastic foot to a metal foot design. In addition to improving the mechanical strength of the interface, the dimensions have been revised to create a better fit on the most recent cameras from Sony.
For me, the most stressful parts of our new home construction have all been related to the concrete. First, we had to find a quarry that was certified not to have pyrrhotite, a mineral of concern for the construction industry, which when exposed to water and air, can break down to form secondary minerals that expand and crack concrete, causing concrete structures, like home foundations, to fail. Second, it was important to schedule around the weather; not too hot, not too cold, and not during or prior to rain. Third, we did not want falling or blowing leaves to wind up on top of the wet concrete. Finally, we had to ensure that all cement trucks after the first, arrived in a timely manner. Happily, today the basement and garage floors were poured representing the last time I will have to concern myself with all the issues above. The basement was poured first using a pump and finished with two concrete trowel (“butterfly”) machines. The garage was poured straight from the truck and finished with a manual float. Tomorrow I will be able to walk on both and assess the quality of the work. Fingers crossed.
The yellow material taped to the ICF walls is Stego’s 15mil vapor barrier that covers the entire basement floor to prevent moisture and gas migration through the concrete. Each pass of the power trowels left the floor progressively more level and smooth. The photo above was taken near the beginning of the process.
With soccer season over, I was able to work with Kyle today as well as yesterday. I completed the electrical wiring and the supply side plumbing while Kyle made great progress on the insulation. We also ordered the tools we will need to level the bathroom floor and expect to tackle that job next weekend. When I returned home, I complete the insulation cover that will be used to protect the temporary water supply at the River House from freezing. Working by headlamp at the end, I installed a thermostatically controlled pipe heater and then the cover. This should be adequate for the immediate future but I will need to run some calculations to see if more insulation or a more powerful heat source will be needed when temperatures get really low.
While swimming at night off the coast of Gloucester, Kyle was attacked by a giant octopus. Fortunately, he was with a group of friends who came to his aid as he pulled himself to the beach with the octopus still on his back. One quick thinker aimed his flashlight at the creature’s eyes which immediately caused it to retreat. Kyle survived the ordeal with no significant injuries other than the distinctive marks on his back. He swears that the encounter left him feeling invigorated and relaxed despite the harrowing experience.
Jeanine hosted an impromptu birthday party this evening for her good friend, Kate Yoder. I was permitted to join the all-female celebration for dinner and cake, both of which were out of this world. It was a wonderful way to end an exceptional day of progress on the River House. Motivated by the need to beat forecasted rain, the site prep crew completed all of the foundation backfill and rough grading before moving on to installing the gravel base for the garage foundation and removal of the last remnants of excavated concrete from the site. Meanwhile, a second crew installed a vapor barrier and steel reinforcement mesh in the basement in preparation for pouring the concrete floor which is scheduled for Monday.
When not working for one of my clients, I spend every spare minute on the River House construction site. I lend assistance to the crew anytime I see an opportunity to help. Most of the time this involves carrying materials or providing an extra set of hands to hold something or keeping the site tidy. When my direct assistance is not needed, I spend time picking concrete remnants, glass, and wood scraps out of the dirt, removing large staples used to attach protection materials to the lumber, caulking and insulating gaps in the framing that will be difficult to reach later. Generally, all the little things that will lead to a better project outcome. Today, my contribution was to build an insulated box to prevent our temporary water supply from freezing when temperatures head south. I was determined to use nothing but scrap lumber. Each side of the box has a sliding window. One to allow access to the spigot and the other to the shut-off valve. The inside is lined with insulation and I will also construct an insulated cover for the exterior. Finally, I will add a thermostatically controlled heating element inside to keep things toasty when the weather gets frosty.
Now that framing is underway, a sign promoting both our architect and builder has been erected at the entrance to our driveway. It puts to shame the simple one that I constructed to display our Department of Natural Resources permit number. Thus far, we are extremely happy with our partners on this project and I can recommend both without hesitation. We feel quite fortunate to be working with them.
Jeanine and I woke up at 4 am to enjoy the lunar eclipse this morning. Weather conditions could not have been more perfect for viewing and our Road House is situated with a perfect view of the setting moon. When time permits, I hope to post a composite image showing the various phases of the eclipse.
Disappointingly, our framing crew had to complete work on another job squandering a perfect day for construction. As cold weather approaches, we are in a race to pour the basement and garage floors in above-freezing temperatures. If the temperature is below 32F during the pour, water in the concrete can freeze causing cracks. Additives can be incorporated to prevent this but they reduce the strength of the concrete which we are hoping to avoid. Before the floors can be completed, we must backfill the foundation walls and that is dependent on finishing the first-floor decking. The decking provides substantial support for the walls to ensure they are not damaged by the substantial forces generated as the backfill is compacted. The idle day did give me an opportunity to take my time photographing the existing structure both from the air and the ground.